INDIANAPOLIS — IU Health on Tuesday unveiled plans for a huge parking facility and loading dock that will use robotic vehicles to load supplies into the new $1.6 billion downtown hospital.
According to plans filed recently with the Indianapolis Metropolitan Development Commission, IU Health is planning a "support building" with five- to eight-levels of parking, a loading dock and office and retail space on its campus near 16th Street and Capital Avenue.
"The building, occupying nearly a full block, will provide critical support needs for the adjacent new hospital and is designed to be compatible with the look of the hospital and other campus structures," IU Health said in a news release.

The support building has a brick-and-granite base with glass storefronts housing up to 13,000-square feet of retail space fronting Capitol Avenue. A perforated metal facade covers upper garage levels that house parking spots for 1,600 to 2,700 vehicles.
The campus will be pedestrian-friendly with sidewalks and native plants. A pedestrian bridge will connect the support building to the hospital.
Automated vehicles will ferry supplies from the loading dock to the hospital via a hidden utility tunnel. Those driverless, robotic vehicles will be "largely unseen by patients and visitors," according to the news release.
IU Health also unveiled plans for a new Central Utility Plant, that will house an energy-efficient power plant, chillers, boilers, heat-recovery coolers, steam for sterilization and fire protection water, along with backup power generators.
"The support building and utility plant are essential support elements for the new downtown hospital and expanded medical campus," James Mladucky, vice president of design and construction for IU Health, said in a statement. "Designed to mesh aesthetically with the evolving campus, the buildings will provide the critical logistics and energy requirements to support IU Health’s unique healthcare mission and ensure the efficient operation of a leading-edge academic health center that will serve future generations of Hoosiers."
The $1.6 billion project will expand the hospital's 16th Street campus by 44 acres. It is scheduled to be completed by 2026.

PREVIOUS: IU Health outlines plans for $1.6B expansion in Downtown Indianapolis
Project updates can be found on IU Health's website.
Contact WRTV reporter Vic Ryckaert at victor.ryckaert@wrtv.com or on Twitter: @vicryc.
-
Vop Osili will not seek re-election for City-County Council President
Indianapolis City-County Council President Vop Osili will not seek re-election at the end of his term, he announced on Tuesday.
Indy Ignite hosts free event Dec. 12 celebrating mascot Pepper's first birthday
Indy Ignite, Indianapolis's first professional women's volleyball team, have announced they will be hosting a free event at Fishers Event Center on Dec. 12!
Silver Alert cancelled for missing 79-year-old man from Camby
A Statewide Silver Alert has been declared for a 79-year-old man who disappeared from Camby, Indiana Tuesday morning.
'More rest, more cops': IMPD’s 10‑Hour shift pilot begins January 3
For the first time in more than three decades, the Indianapolis Metropolitan Police Department is changing the way its officers work — moving to 10‑hour shifts starting January 3, 2026.