INDIANAPOLIS — The new Interstate 65/Interstate 70 flyover bridge, the largest structure within the ongoing North Split Project, is now open to traffic, the Indiana Department of Transportation has announced.
Drivers traveling southbound on I-65 will now use the newly-constructed south-to-east bridge, which spans from College Avenue to Lewis Street to connect to I-70 eastbound.
The on-ramp from Delaware and 11th streets to I-70 eastbound also reopened Friday. Traffic is being routed directly onto the new flyover bridge.
RELATED | North Split construction more than halfway done, still a hassle for those who live and work near it
The $350 million North Split Project is the first reconstruction of Indianapolis' well-traveled highways since they first opened in 1968. It is expected to remedy many of the safety issues that plagued the North Split before its closure.
The project will replace or repair 32 bridges over 3.1 miles of highway, reconfigure traffic patterns and condense the size of the interchange, according to an environmental assessment conducted by INDOT.
Access to downtown is available via the following routes as construction continues:
- I-70 westbound collector/distributor (C/D) ramp exit ramp to Michigan Street (13-ton declared vehicle weight restriction in effect)
- Pine Street entrance ramp to I-70 eastbound from Michigan Street and New York Street
- I-65 northbound/I-70 eastbound exit ramp to Washington Street (13-ton declared vehicle weight restriction in effect)
- I-65 northbound and southbound to Martin Luther King. Jr./West Street
- I-65 southbound to Meridian Street
- I-65 northbound to Meridian and Pennsylvania Streets
- All existing ramps on I-70 west of the South Split
RELATED | What the 18-month North Split closure means for Indy traffic
INDOT says drivers should slow down, be cautious, look out for changing traffic patterns and avoid driving distracted as construction continues.
More information on the North Split project is available online.
-
AES Indiana seeks public input on coal ash contamination corrective measures
Groundwater monitoring results of the Harding Street Station's Ash Pond System found levels of arsenic, lithium and molybdenum above groundwater protection standards.Program trains future teachers at Alexandria-Monroe High School
A pre-apprenticeship program in Alexandria Community School Corporation is helping high school students get a head start on becoming teachers, while also addressing the nationwide teacher shortage.Fever stay alive in playoffs with 77-60 Game 2 rout over Dream
The Fever hosted their first playoff game since 2016 and fed off the energy of another sellout crowd to earn their first postseason win since Oct. 11, 2015, when they beat the Minnesota Lynx 75-69.Independent Indiana pushes to put more nonpartisan candidates on ballots
Independent Indiana is working to turn down the temperature on political disagreement by getting more independent candidates on the ballot, its leaders say.